Badger Hollow Observatory Construction: 2015-05-03

The concrete has cured and the forms removed from the pier
The floor joists have been framed
The post height has been marked
And the posts cut
Strong-ties have been added to the posts for the exterior glulams
The center tynes for the debris fork were removed
And the tractor used to lift the glulams into place
The glulams are fastened
The structure is ready for the roll off roof and walls