Badger Hollow Observatory Construction: 2015-08-16

A trench was dug 165 feet long between the observatory to the main house electrical panel
Conduit was run (1.25" for power and 0.75" for cat6a)
An additional 0.75" conduit was run to the pond for a future project
Four #6 electrical lines were pulled through the conduit (2 power, 1 neutral, and 1 ground)
Conduit and power was run into the building
The power lines were wired to the observatory subpanel
The tractor made quick work of filling in the trench
The pier base plate is installed